Project Case Studies

  • Tottenham Hotspur Football Stadium

    Ecocem GB worked in conjunction with Macrete to manufacture over 9,000 individual pieces of precast concrete delivered on 1600 road deliveries over 18 months to the stadium.

  • Soil Stabilisation

    Ecocem GGBS and GGBS-rich blended cements are suitable technical solutions for your geotechnical works both when looking for soil properties improvement or brownfield remediation cases.

  • HS2

    HS2 is Britain’s new high-speed rail line being built from London to the North-West, with HS2 trains linking the biggest cities in Scotland with Manchester, Birmingham, and London. HS2 is the largest infrastructure project in Europe and the most important economic and social regeneration project in decades.

  • Edmonton EcoPark

    Over 300m3 of ultra-low carbon concrete was poured on the EcoPark South Waste Management Hub at Edmonton EcoPark in London, which was completed in February 2022. This cut the carbon footprint of the concrete used in this part of the project by 70%.

  • Dover Harbour

    The Dover Harbour Western Breakwater was manufactured by Macrete and supplied to Volker Stevin Ltd on behalf of the Port of Dover.